Quick answer
Migrate in five steps: export Todoist data, pick the new tool and map the structure, run a 2-week parallel pilot with a small team, migrate everything, then freeze the old tool read-only. Details below.
Step 1 — Export your Todoist data
Export boards/projects, tasks, attachments and history where available — Todoist typically offers CSV/JSON exports per workspace or via API. Save everything, even what you won’t migrate.
Join Doitify Today
Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.
Step 2 — Map the structure
Decide what moves: active projects and open tasks always; completed history optionally. Map Todoist’s concepts (boards/cards/lists) to the new tool’s — this mapping is the real work.
Step 3 — Set up and pilot
Build the new workspace: projects, columns, templates, users. Run a 2-week pilot with one real project — real work exposes mapping gaps a demo never will.
Step 4 — Full migration
Import the mapped data (CSV/API/manual rebuild), verify task counts and attachments, assign owners and dates — verify before announcing.
Step 5 — Cutover and freeze
Announce the date, make Todoist read-only (don’t delete — keep as archive), run both briefly if needed, then complete the switch. Document where the archive lives.
Common mistakes
- Big-bang cutover: pilots find the gaps cheaply — don’t skip them.
- Migrating everything: completed history often doesn’t need to move — archive, don’t import.
- No training: book a team walkthrough before cutover, not after complaints.
- Deleting the old tool: keep it read-only for a quarter — you’ll want the history once.
Choosing the destination
If Todoist’s limits (not a team PM tool) pushed you out, evaluate TickTick, Things 3, Doitify — and Doitify, which covers full PM features on a free plan.
[dt_box title=”Try Doitify”]Free plan with tasks, Gantt, kanban, goals and workload — migrate to Doitify and keep the budget intact.[/dt_box]
FAQ
Bottom line
Export, map, pilot, migrate, freeze — the five steps that move a team off Todoist without losing work or momentum. The pilot is the step that saves you.
If this post was helpful, you might also enjoy AI Scrum Master: What It Is, How It Works and When to Use One and AI for Sprint Planning: A Practical Guide.
Join Doitify Today
Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.