Stay focused, stay motivated

Loading...

Doitify
Pricing Enterprise Download Contact Us
Logistics & Supply Chain

Doitify for Logistics & Supply Chain

Run routes, fleets and warehouse teams on one goal-driven operations OS.

  • Kanban route & dispatch boards
  • Mobile field updates
  • Shift & route calendar
  • Delivery task tracking
  • KPI & bottleneck dashboards
Start planning your operations free

A day in the life of Logistics & Supply Chain without the right system

If any of this feels familiar, Doitify was built for you.

Dispatch changes every few minutes

Plans shift constantly and drivers still receive outdated route sheets by phone. By the time everyone is updated, the day has already moved on.

One sick call breaks the roster

A single absence leaves you rebuilding the entire day's schedule by hand while trucks wait in the yard.

Blind spots on the road

Once a truck leaves the depot there is no live view of delays, detours or proof of delivery.

Paperwork arrives days late

Delivery notes, fuel slips and signatures pile up before anyone enters them into a system.

Depots work in silos

Warehouse, transport and customer service each keep their own spreadsheet, and the numbers never match.

Bottlenecks surface too late

You usually learn a route is failing only after customers start calling to complain.

The real problems Logistics & Supply Chain face — and how Doitify solves them

We built Doitify around these exact blockers. Here is what changes.

The problem

Routes change faster than the paperwork

With Doitify

Update tasks on the Kanban dispatch board and mobile field updates push the change to drivers instantly.

The problem

Absences wreck the roster

With Doitify

Rebuild shifts in seconds on the shared Calendar and reassign replacements using permissions-aware roles.

The problem

No live visibility on the road

With Doitify

Drivers send mobile status updates, photos and delivery confirmations from the field.

The problem

Documents arrive days late

With Doitify

Capture delivery notes and slips as form submissions with file attachments directly on site.

The problem

Depots work in silos

With Doitify

One shared workspace with sub-boards per depot, linked tasks and team chat keeps everyone aligned.

The problem

Bottlenecks surface too late

With Doitify

The Bottleneck view and Risk Manager flag failing routes before customers feel the impact.

What Doitify gives Logistics & Supply Chain

The same integrated platform, tuned to how you actually work.

Kanban dispatch board

Assign and move every delivery on a board so dispatch sees the full load at a glance.

Mobile field updates

Drivers change status, attach photos and confirm deliveries straight from the mobile view.

Shift & route calendar

Plan shifts and recurring routes on the shared Calendar with repeating schedules.

Gantt route planning

Lay out multi-stop routes and vehicle maintenance windows on a Gantt timeline.

KPI dashboards

Track on-time rate and cost per delivery in dashboards and the Project Health view.

Team chat per route

Keep dispatch, drivers and depot staff talking in task-linked team chat.

How Logistics & Supply Chain achieve results with Doitify

One connected flow from goal to result.

01

Set the operations goal

Define the outcome, such as fewer late deliveries or a lower cost per kilometre, as a measurable goal.

02

AI Copilot builds the plan

AI Copilot turns that goal into a full plan with boards, tasks and a timeline.

03

Run structured execution

Work the plan on Kanban, Gantt and sub-boards with shift calendars and mobile updates.

04

Daily AI Coach

AI Coach reviews progress each day and suggests the next best move for dispatch.

05

Accountability at every step

Assign owners, due dates and daily reports so every route has a responsible name.

06

Measure the result

Dashboards, KPI and Project Health show the outcome against the original goal.

What Logistics & Supply Chain actually get

Not features — results. This is what changes after you switch.

🚚

More on-time deliveries

Routes and shifts stay coordinated so fewer deliveries slip through.

📱

Real-time field reporting

Drivers report status from mobile instead of end-of-day paperwork.

⏱️

Faster dispatching

Kanban dispatch and templates cut the time it takes to plan a day.

👁️

Full operational visibility

Dashboards show where every truck and task stands right now.

💰

Lower operating cost

The Bottleneck view trims wasted kilometres and idle time.

🧘

Less firefighting

Risk Manager surfaces problems before they escalate into emergencies.

The Logistics & Supply Chain shift: doing it the hard way vs with Doitify

Same goals, same people — a completely different week.

Dispatch
Without Doitify

Routes rebuilt by phone every morning.

With Doitify

Kanban dispatch board with tasks pushed to drivers via mobile field updates.

Scheduling
Without Doitify

Shifts juggled on a whiteboard.

With Doitify

Shared Calendar with recurring shifts and role-based reassignment.

Field reporting
Without Doitify

Paper notes collected days later.

With Doitify

On-site form submissions with photo and file attachments.

Visibility
Without Doitify

Blind until a customer complains.

With Doitify

KPI dashboards and Project Health in real time.

Problem spotting
Without Doitify

Bottlenecks found after the fact.

With Doitify

Bottleneck view and Risk Manager flag issues early.

Frequently asked questions about Logistics & Supply Chain

Yes, the mobile view lets them change status, add photos and confirm deliveries on the spot.

The shared Calendar and Gantt support recurring shifts as well as multi-stop routes.

Sub-boards and permissions let each depot run its own space while sharing one workspace.

The Bottleneck view and Risk Manager surface delays before they reach customers.

Yes, Doitify is free to start and premium unlocks the AI Copilot and AI Coach.

Dashboards and KPI track the on-time rate, cost per delivery and other operational metrics.

Yes, the mobile view supports field updates from any device in the yard or on the road.

API, Webhooks and MCP let you integrate existing logistics and ERP tools.
Logistics & Supply Chain

Ready to get started with Logistics & Supply Chain?

Create your first board in minutes — AI planning, coaching and accountability included.