Quick answer
The V-Model pairs each build phase with its test phase — requirements↔acceptance, design↔system test, architecture↔integration, code↔unit test: testability designed in from the start.
The V shape
Left leg: requirements → design → architecture → code. Right leg: unit → integration → system → acceptance tests, each verifying its left twin.
Join Doitify Today
Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.
The discipline
Test plans written when their spec phase is written — verification designed with the spec, not after.
Where it fits
Safety-critical, regulated engineering — automotive, medical, aerospace — where traceability is mandatory.
The cost
Rigid sequence, late feedback — the price of mandated traceability.
Bottom line
The V-Model pairs each build phase with its test phase — requirements↔acceptance, design↔system test, architecture↔integration, code↔unit test: testability designed in from the start.
FAQ
If this post was helpful, you might also enjoy Project Closure Checklist: Close Projects the Right Way and Risk Register: What It Is and How to Create One.
Join Doitify Today
Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.