Do what you can with what you have

Loading...

Doitify
Pricing Enterprise Download Contact Us
Doitify › Project Planning & Execution

“Trello Pricing: Plans, Costs and Hidden Fees (2026)”

Updated on November 12, 2026 https://doitify.com/planning/trello-pricing-plans-costs-and-hidden-fees/
Share
Summary

Trello pricing explained for 2026: Free, Standard, Premium and Enterprise costs, guest billing rules, Atlassian Guard, Power-Up fees, and worked budget.

Trello has four plans in 2026: Free ($0), Standard ($5 per user per month billed annually, $6 monthly), Premium ($10 annual, $12.50 monthly), and Enterprise ($17.50 per user per month, billed annually only). The Free plan allows up to 10 collaborators and 10 boards per workspace, with 250 automation command runs per month.

How does Trello pricing work in 2026?

Trello charges per workspace member per month, with a lower rate for annual billing. A workspace member is anyone added to the workspace as a normal member or admin. Guests who only touch one board are free; guests active on multiple boards convert into billable seats.

The plan ladder is built around three limits rather than feature bundles: boards per workspace, automation command runs, and views. Free caps boards at ten and automation at 250 runs per month. Standard removes the board cap, adds custom fields and AI, and raises automation to 1,000 runs. Premium removes the automation cap entirely and adds calendar, timeline, table, dashboard, and map views. Enterprise removes workspace limits and adds organization-wide administration.

That structure matters because most upgrades are triggered by a limit, not by a feature request. Teams rarely wake up wanting a dashboard; they wake up unable to automate a rule they need.

What does each Trello plan cost?

The published 2026 prices are unchanged at the entry tiers: Standard remains $5 annually and $6 monthly, Premium $10 annually and $12.50 monthly, and Enterprise $17.50 per user per month with annual billing only.

Plan Monthly billing Annual billing Boards per workspace Automation runs per month File storage Key gate
Free $0 $0 10 250 10 MB per file 10 collaborators, no custom fields
Standard $6/user $5/user Unlimited 1,000 250 MB per file No timeline or dashboard views
Premium $12.50/user $10/user Unlimited Unlimited 250 MB per file No organization-wide admin
Enterprise Not offered $17.50/user Unlimited workspaces Unlimited 250 MB per file Annual commitment required

Free is unusually capable for a free tier: unlimited cards, unlimited Power-Ups per board, unlimited activity log, assignees and due dates, mobile apps, and 2FA. Its two real constraints are ten collaborators and ten boards per workspace, which is enough for a household or a five-person startup and not enough for a department.

Standard is the value tier. For $5 per user per month annually, it unlocks unlimited boards, advanced checklists, custom fields, card mirroring, list colors, collapsible lists, AI features, and 1,000 automation runs. For most teams under twenty people, Standard is the correct default.

Premium is about visibility and control. It adds calendar, timeline, table, dashboard, and map views, workspace-level views, unlimited automation, admin and security features, observers, collections, and simple data export. The jump from $5 to $10 is justified when someone needs to report across boards or when automation volume exceeds 1,000 runs.

Enterprise is annual-only at $17.50 per user per month, or $210 per user per year. It adds unlimited workspaces, organization-wide permissions, organization-visible boards, public board management, multi-board guest administration, attachment permissions, Power-Up administration, and free SSO and user provisioning through Atlassian Guard.

Join Doitify Today

Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.

Who counts as a billable member in Trello?

Only workspace members are billed, plus a specific category of guest. A single-board guest is free. A guest who is a member of two or more boards in the same workspace becomes a multi-board guest and is billed at the same rate as a Standard or Premium member.

This rule is the most common source of invoice surprise. Contractors, clients, and cross-functional partners are often invited to several boards because that is how the work actually flows, and each of them silently becomes a paid seat.

There is a legitimate design pattern here: keep external collaborators on a single shared board, and give internal staff membership. Teams that do this cut guest costs to zero. Teams that add every freelancer to every board pay for people who log in twice a month.

How much does Trello cost for 8, 25 and 60 users?

The per-seat math is simple; the billing cycle and guest rules are where the totals diverge.

Example 1: an 8-person team on Standard. Eight members at $5 per month billed annually is 8 × $5 × 12 = $480 per year. Monthly billing is 8 × $6 × 12 = $576. The annual plan saves $96, or 16.7%. At this size Trello is cheaper than almost any dedicated project tool, and the free plan may still be enough if the team stays under ten boards.

Example 2: a 25-person team on Premium. Twenty-five members at $10 per month annually is 25 × $10 × 12 = $3,000 per year, against $3,750 on monthly billing, a saving of $750. Now add five freelancers who each work across three boards. They are multi-board guests, so they are billed as members: 5 × $10 × 12 = $600, taking the total to $3,600. If those five were restricted to one board each, the total would stay at $3,000.

Example 3: a 60-person organization on Enterprise. Sixty users at $17.50 per month annually is 60 × $17.50 × 12 = $12,600 per year. If the organization also needs Atlassian Guard for SAML SSO and enforced 2FA across Atlassian products, Guard starts at $4 per user per month, which adds 60 × $4 × 12 = $2,880, for $15,480. That is the number to compare against enterprise tiers of Asana, Monday, or Smartsheet, not the $17.50 headline.

Where are the hidden fees in Trello pricing?

Trello does not hide charges, but it does separate them. Four categories account for almost every overrun.

Multi-board guests. As above, guests on two or more boards are billed like members. A 40-person workspace with 15 active external collaborators can carry 15 invisible seats, or $1,800 per year on Premium.

Atlassian Guard. SSO and enforced two-factor authentication are Guard capabilities, not Trello plan features. Guard is a separate Atlassian subscription starting at $4 per user per month and applies across the Atlassian products you use. Enterprise includes a Guard Standard entitlement, but organizations needing advanced Guard features pay more.

Paid Power-Ups. Trello allows unlimited Power-Ups on paid plans, but many are third-party subscriptions with their own per-user fees. Time tracking, advanced reporting, and CRM connectors frequently cost $5 to $15 per user per month on top of Trello. A team that stacks three paid Power-Ups can double its software cost without changing its Trello plan.

Automation ceilings. Standard stops at 1,000 command runs per month. There is no overage purchase; rules simply stop executing. The practical cost is the Premium upgrade at $5 per user per month more, which for 25 users is $1,500 per year.

Two smaller costs are worth noting. Enterprise is annual-only, so there is no monthly escape hatch at that tier. And the free plan’s ten-collaborator limit counts only workspace members, so a team can appear to be within the limit while guest activity pushes against board and automation limits.

Is annual billing worth it for Trello?

Yes, if your headcount is stable. Annual billing saves about 17% on Standard and 20% on Premium, which is a meaningful discount for a tool most teams keep for years.

The trade-off is prepayment. A 25-person Premium team pays $3,000 upfront instead of $312.50 per month, and Atlassian does not refund unused seats if the team shrinks. For a company that hires in bursts or runs contractor-heavy projects, monthly billing preserves flexibility for a modest premium.

Enterprise has no monthly option, so the decision there is not about billing cycle but about commitment length. Multi-year Enterprise agreements sometimes include additional discounts, and it is worth asking.

How does Trello compare with alternatives on price?

Trello is the cheapest credible kanban tool at small scale and the most expensive per seat at large scale, because Enterprise pricing assumes organization-wide governance.

Tool Entry paid price Free tier Cost driver Best fit
Trello $5/user/month (annual, Standard) 10 collaborators, 10 boards Guests, Guard, Power-Ups Simple visual workflows
Zoho Projects $4/user/month (annual, Premium) 5 users, 3 projects SSO and read-only users at Enterprise Teams needing Gantt, timesheets, budgets
Smartsheet $9/user/month (annual, Pro) 30-day trial Member caps and automation limits Spreadsheet-style project and portfolio work
Doitify Free board for up to 5 members Permanent free board Modular members, storage, SMS, AI credits Goals, projects, and team execution

For a five-person team that wants boards and nothing else, Trello Free or Standard is hard to beat. For a team that needs dependencies, workload views, time tracking, and reporting, the stack of Power-Ups needed to make Trello match a project platform usually costs more than the platform.

Transparency note: Doitify is our product. We include it because Trello buyers often reach the point where boards are no longer enough. Doitify is a platform for project management, team management, and goal achievement, with kanban boards, multi-level tasks and subtasks, checklists, WBS dependencies, sprints, Gantt charts, roadmaps, calendars, workload and resource management, reports, project finance, CRM, meeting notes, risks, team chat, and AI support through Copilot and AI Coach. It uses a modular calculator rather than fixed per-seat tiers: members, storage, reminders, SMS, pro email, and Copilot credits are priced separately, and a free board supports up to five members.

What mistakes do teams make when buying Trello?

Most Trello overspend comes from five avoidable decisions.

Inviting everyone as a member. Guests are free on a single board. Teams add external collaborators to the workspace because it is faster, then pay for them every month.

Choosing Free for a real team. The ten-board limit is a hard stop, and the 250-run automation cap is consumed by a handful of rules. Free is a trial, not a strategy.

Buying Premium for views nobody opens. Dashboard and timeline views are valuable when a stakeholder reviews them weekly. If nobody does, Standard is enough.

Forgetting Power-Up costs. A reporting Power-Up at $10 per user per month doubles the cost of Premium. Price the whole stack, not the board.

Assuming Enterprise includes Guard entirely. Enterprise includes a Guard Standard entitlement, but advanced Guard capabilities are a separate purchase. Confirm what your security team requires before signing.

Who should choose Trello, and who should not?

Trello is the right choice for teams whose work is genuinely visual and relatively simple: content calendars, editorial pipelines, hiring trackers, personal task boards, small agency workflows, and any process where a card moving across a board is the whole model.

It is the wrong choice for teams that need dependencies, critical paths, resource leveling, budget tracking, or portfolio reporting. Those requirements push teams into Power-Ups and then into a different platform, and the migration cost is usually higher than the price difference would have been.

The honest trade-off: Trello’s simplicity is its product. You get a five-minute onboarding and almost no training cost, and you give up the structural depth that complex projects need. For a 40-person engineering program, that trade is bad. For a six-person marketing team, it is excellent.

How do you forecast a three-year Trello budget?

Model four lines: members, guests, Guard, and Power-Ups. Multiply members by the annual monthly rate by twelve, add the expected multi-board guest count, add Guard if SSO is required, and add any paid Power-Up subscriptions per user.

A worked example for a 30-person team on Premium: year one is 30 × $10 × 12 = $3,600. Assume four multi-board guests, adding 4 × $10 × 12 = $480, and one reporting Power-Up at $6 per user per month, adding $2,160. The year-one total is $6,240. At 10% annual growth, year two is about $6,864 and year three about $7,550. The three-year total is roughly $20,654, more than 90% above the naive $10,800 seat calculation.

That gap is the argument for reviewing the stack annually rather than at renewal. Removing one Power-Up or converting three guests to single-board access often pays for a year of a more capable platform.

FAQ

Free is $0. Standard is $5 per user per month billed annually or $6 monthly. Premium is $10 annually or $12.50 monthly. Enterprise is $17.50 per user per month, billed annually only.

Yes. It supports up to 10 collaborators and 10 boards per workspace, with unlimited cards, unlimited Power-Ups, 250 automation runs per month, and 10 MB per file.

Single-board guests are free. A guest who belongs to two or more boards in the same workspace is a multi-board guest and is billed at the member rate.

Guard is Atlassian's security subscription, starting at $4 per user per month. It provides SAML SSO, enforced 2FA, and user provisioning across Atlassian products. You need it if your security policy requires SSO or centralized identity management.

Yes. Premium includes unlimited Workspace command runs. Standard is capped at 1,000 per month and Free at 250.

No. Enterprise is billed annually at $17.50 per user per month, or $210 per user per year.

Yes. Trello offers nonprofit and education discounts, which are applied through Atlassian's community programs rather than the standard checkout.

Conclusion

Trello’s 2026 pricing is still one of the best deals in software at the low end: $5 per user per month buys unlimited boards, custom fields, and enough automation for most small teams, and the free plan is genuinely usable.

The cost curve turns at scale. Multi-board guests, Guard, paid Power-Ups, and the annual-only Enterprise tier push real costs well above the sticker. Teams should model the whole stack, not the seat price, and should revisit the plan whenever automation or guest counts change.

If your work is visual and simple, Trello is the right answer and the price is fair. If your work needs dependencies, budgets, and portfolio reporting, the money spent making Trello behave like a project platform is better spent on one.

If this post on Trello pricing was helpful, you might also enjoy Project Manager vs Product Manager: 5 Key Differences and Best Project Management Software With Goal Tracking.

Join Doitify Today

Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.

0 0 votes
Article Rating
Share
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Table of Contents

Ready to do more with Doitify?

Bring your projects, team, and goals together in one AI-powered workspace.

Get Started
Table of Contents