How much does Notion cost per member in 2026?
Notion pricing is a key topic in modern project management and teamwork. Notion’s list price is per member, and the four plans have not changed name since 2023. What changed is what sits behind them. Business now bundles the AI features that used to be a separate purchase.
| Plan | Yearly billing | Monthly billing | AI access | Typical buyer |
|---|---|---|---|---|
| Free | $0 | $0 | Limited trial | One person organizing notes and personal projects |
| Plus | $10 per member | $12 per member | Limited trial | Small teams that need unlimited uploads and guests |
| Business | $20 per member | $24 per member | Full AI plus admin controls | Teams that need AI, SSO and permissions |
| Enterprise | Custom | Custom | Full AI plus data controls | Organizations with security and procurement reviews |
Two details matter more than the numbers. First, every price shown on the pricing page is the annual rate; flip the toggle and the monthly rate appears. Second, the gap between Plus and Business is not a feature gap you can partially close. It is a $10 per member per month step, and it is the single most consequential decision in the whole purchase.
There is no free trial on paid plans. Notion’s free tier is permanent rather than time-limited, and that is the intended evaluation path.
What does the Free plan actually include?
The Free plan is generous for one person and cramped for two. A single-member workspace gets unlimited pages and blocks, databases with sub-items and dependencies, Notion Calendar, basic forms and sites, and a 7-day page history. File uploads cap at 5 MB per file and you can invite up to 10 guests.
The constraint that catches teams is the block ceiling. Notion states plainly that a Free workspace with two or more members can add a limited number of blocks before it has to upgrade. Existing content stays readable and editable, which makes the limit feel softer than it is: you simply cannot add new blocks, and there is no published number to plan against.
For a solo consultant tracking clients, Free is genuinely enough. For two co-founders writing a product spec together, it becomes a wall within weeks.
Join Doitify Today
Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.
When does Plus stop being enough?
Plus removes the three limits that most small teams hit: uploads become unlimited (around 5 GB per file), page history extends to 30 days, and guests become unlimited. It also adds custom forms and sites, charts, collaborative blocks, basic integrations, and custom database automations.
What Plus does not add is administration and AI. There is no SAML single sign-on, no private teamspaces, no granular database permissions, no audit log and no verified pages. Those live on Business, together with the full AI suite.
The practical test is simple. If your team asks for any of the following, you have already outgrown Plus: ongoing AI use, SSO, per-database permission rules, or a 90-day audit trail. Each of them requires the $20 tier, so the real question is whether one of them is non-negotiable.
Is Notion AI included in the price?
No on Free and Plus, yes on Business and Enterprise. Free and Plus workspaces get a limited, one-time trial of AI responses. When it runs out, the only upgrade path is Business or Enterprise, because the old standalone add-on no longer exists.
Notion retired the $10 per member AI add-on on 13 May 2025 and folded AI into Business, raising that plan from $15 to $20 per member. Existing subscribers kept the add-on for a while, and Notion began ending some of those legacy discounts in late 2026. If you are on an old plan and your renewal quote looks wrong, this is why.
The consequence is easy to state and easy to forget: for a team that would otherwise sit on Plus, the effective price of Notion AI is the plan delta, $10 per member per month, or $120 per member per year. A ten-person team pays $1,200 a year for AI, whether or not every member uses it.
What are Notion credits, and when do they cost money?
Credits are the metered layer that sits on top of the Business seat price. They pay for Custom Agents, the programmable agents that run tasks inside a workspace, and for Workers. Business includes a monthly allowance per seat, commonly listed as 1,500 standard and 500 select credits; Enterprise negotiates its own amount.
Once the allowance is gone, additional credits cost $10 per 1,000 per month. They are pooled across the workspace, cannot be rolled over, and must be switched on by an administrator. Notion has also confirmed that AI Meeting Notes will begin consuming standard credits from 1 December 2026, which turns a previously free-looking feature into a metered one.
That is the hidden fee worth modelling. A single chat question is cheap. An agent that runs every morning across a 40-person workspace is not, and the cost scales with usage rather than with seats, which is unfamiliar territory for teams used to flat per-seat pricing.
Which hidden fees appear on a Notion invoice?
Most surprises come from eight places. None of them is deceptive, and all of them are avoidable with a little planning.
- Member versus guest. Guests are free on paid plans but cannot reach everything a member can. Anyone who needs workspace-wide access, private teamspaces, or membership of multiple projects is a paid member.
- Annual commitment. The advertised price assumes twelve months up front. Cancelling early does not refund the remaining term.
- Custom domains. Publishing a Notion site on your own domain is a separate per-workspace add-on, around $8 per month on annual terms at the time of writing. Confirm the current figure at checkout.
- Credits. Metered agent usage at $10 per 1,000, plus the new metering of meeting notes from December 2026.
- Tax. List prices exclude VAT and sales tax in most regions.
- No trial. There is no paid trial and no refund window, so a monthly month is your only real test drive.
- Legacy discount expiry. Older Business discounts are being phased out, so renewals can jump without a plan change.
- Enterprise add-ons. Zero data retention, SCIM provisioning and advanced controls are sales-led and priced per contract.
Four Notion bills, worked out
Prices make more sense with arithmetic attached. These four scenarios use the November 2026 list prices.
Solo consultant. Starts on Free, needs version history and big file uploads, so buys Plus annually: $10 × 12 = $120 per year. If she later wants AI for client summaries, Business is the only route: $240 per year. The AI decision alone costs $120 a year, or 100% more than her current plan.
Five-person studio on Business. Annual: 5 × $20 × 12 = $1,200 per year. Monthly: 5 × $24 × 12 = $1,440 per year. Choosing monthly to keep flexibility costs an extra $240 a year, a 20% premium over the annual figure and about 17% over the per-seat annual rate. Add a custom domain at roughly $8 per month and the annual total lands near $1,296.
Twenty-five-person scale-up. 25 × $20 = $500 per month, or $6,000 per year, versus $250 per month and $3,000 per year on Plus. The $3,000 difference buys AI, SSO, granular permissions and a 90-day audit log. If three Custom Agents burn 6,000 credits a month beyond the included allowance, add $60 per month, or $720 per year, bringing the total to $6,720.
A seat audit that pays for itself. A 30-person company has 30 members because everyone was invited as a member by default. Only 12 people create pages or manage databases; the other 18 read, comment and fill in forms. Moving those 18 to guest access cuts the bill from 30 × $20 = $600 per month to 12 × $20 = $240 per month. That is $4,320 a year saved without losing a single reader, provided none of them needs teamspace access.
Does annual billing really save 20%?
Not quite. Plus runs $10 against $12 and Business runs $20 against $24, which is a 16.7% saving on the monthly rate, and Notion advertises up to 20% across its plans. The difference is small but the commitment is not.
The break-even is easy to compute. On Business, annual billing saves $4 per member per month, or $48 per member per year. If there is a realistic chance you cancel within eight months, monthly billing is cheaper in total. If you are confident about twelve months, annual is the better deal and the discount is effectively free.
One trap: teams often pay annually for seats they have not filled yet. Buy annual seats only for people who have already logged in during the past month.
How does Notion’s model compare with Coda and Todoist?
Notion bills per member. Coda, now sold as Superhuman Docs, bills per Doc Maker, and Todoist bills per user. Different units produce very different bills for the same team.
| Tool | Billing unit | Entry paid price | Free-plan ceiling | AI on entry plan |
|---|---|---|---|---|
| Notion | Member | $10 per member per month, yearly | Blocks capped for 2+ members | Trial only |
| Coda / Superhuman Docs | Doc Maker | $12 per Doc Maker per month, yearly ($15 monthly) | 1 GB per doc, 7-day history | Trial |
| Todoist | User | $5 per user per month, yearly ($60 per year) | 5 personal projects | Limited sessions |
Coda’s model is a genuine advantage for read-heavy teams: a 20-person team with 3 Doc Makers pays $432 a year on annual Pro, while the same 20 people on Notion Plus would pay $2,400. Push the Doc Maker share above roughly 83% and the advantage disappears.
Todoist sits at a different price point entirely, because it is a task manager rather than a document workspace. A ten-person team pays $480 a year on Pro annually. The comparison is only fair once you decide which problem you are solving.
Where does Notion pricing stop making sense?
Three situations deserve honesty.
Wide, shallow teams. If most of your people read, comment or submit forms, per-member pricing charges you for consumption. Coda’s Doc Maker model or a guest-heavy Notion setup is cheaper.
Delivery-heavy projects. Notion databases can hold tasks, owners and dates, but native scheduling depth is limited. There is no built-in critical path, resource levelling or workload balancing. Teams running multi-project portfolios usually end up bolting on a second tool, which is a cost the pricing page never shows.
Cost-sensitive AI. Bundling AI into the $20 tier is simple, but it means paying for AI on every seat even when two people use it. Metered credits on top make forecasting harder, not easier.
Notion’s strength is the same in all three cases: one flexible surface for documents, databases and lightweight process. That flexibility is real value, and it is why the pricing works for so many teams.
What should you check before you buy?
Six checks, in order of impact:
- Count the people who genuinely need member access, and test whether the rest can work as guests.
- Decide whether AI, SSO or granular permissions are must-haves. If any is, your floor is Business.
- Estimate agent usage before you promise a budget, and set a credit ceiling in the admin settings.
- Choose annual billing only for seats that are already active.
- Check whether a custom domain is needed, and add roughly $8 per month per workspace if it is.
- Confirm how much tax will be added in your region before you compare quotes.
When is a project workspace the better purchase?
If your team’s bottleneck is delivery rather than documentation, the money is better spent on a tool that models work directly. That is the gap Doitify is built for, and it is our product, so read this section with that in mind.
Doitify handles the parts Notion leaves to manual database design: multi-level tasks and sub-tasks with checklists, WBS dependencies, sprints and backlogs, roadmaps, Gantt charts, calendars, workload and resource views, and reports on progress and performance. It also covers the operational layer around delivery, including risks and constraints, milestones, meeting notes, project documents, CRM, finance, automations and team chat. Doitify Copilot and AI Coach work as a project-management assistant and virtual Scrum Master, turning a stated goal into tasks, plans, sprints and reports.
Where Notion wins is unstructured knowledge: wikis, specs, research notes, and anything where the page is the product. Many teams reasonably run both, and the question is which one holds the schedule.
FAQ
Conclusion
Notion pricing is fair for what it delivers, but it is not one number. The sticker price covers seats. The real budget covers seats, an AI decision worth $10 per member per month, credits for anything that runs on a schedule, and a domain add-on if you publish.
Start with the seat audit. It is the only lever that saves money without changing how your team works, and in the example above it cut a bill by 60% in a single afternoon. Then decide whether AI is a must-have, because that single question is the difference between $10 and $20 per member and it drives everything else.
If this post on Notion pricing was helpful, you might also enjoy Project Planning: A Complete Step-by-Step Guide and Project Timeline: How to Create One (Step-by-Step Guide).
Join Doitify Today
Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.