Done is better than perfect

Loading...

Doitify
Pricing Enterprise Download Contact Us
Doitify › Project Planning & Execution

Best Linear Alternatives in 2026 (Free and Paid)

Updated on November 12, 2026 https://doitify.com/planning/linear-alternatives/
Share
Summary

The best Linear alternatives in 2026 compared: Plane, Shortcut, Trello, Hive, Teamwork and Doitify, with real per-seat pricing and migration steps.

Linear’s strengths are speed, opinionated defaults, and a clean issue model — not time tracking, budgets, or client-facing delivery. Linear pricing in 2026: Free (2 teams, 250 issues), Basic $10/user/month, Business $16/user/month (both billed yearly), Enterprise custom.

Why do teams look beyond Linear?

linear alternatives is a key topic in modern project management and teamwork. Because Linear is designed for one kind of work, and most companies contain at least four.

  • No time tracking, budgets, or billing. Professional services teams cannot invoice from Linear, so they run a second system.
  • No Gantt or dependency-driven scheduling. Issue relations exist, but there is no resource-levelled timeline for a hardware launch or a multi-vendor migration.
  • Reporting is narrow. Insights and dashboards are Business-tier features, and they answer questions about issue flow — not utilisation or margin.
  • External collaboration is limited. Guests and private teams arrive at Business; client portals do not exist.
  • The free tier has a hard issue cap. Free includes 250 issues and two teams, which is generous for a side project and useless for a real backlog.
  • Cost scales linearly with headcount. At $16 per user per month, a 50-person organisation pays $9,600 a year, and half of those people may only need to read.

None of that is a flaw in Linear. It is a boundary, and boundaries are fine until your work crosses them.

How we evaluated these alternatives

We compared each option on five things that determine whether a switch actually sticks:

  1. Issue model — does it support sub-issues, relations, and a backlog that survives 2,000+ items?
  2. Planning layer — cycles or sprints, roadmap, and some view of dependencies.
  3. Non-engineering usability — can marketing, support, or a client work in it without training?
  4. Cost at 15 and 35 seats — the annual number, not the sticker.
  5. Migration path — importer availability, API, and how much history survives.

Join Doitify Today

Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.

Comparison table: five Linear alternatives in 2026

Tool Entry price (2026) Free tier Best for Main trade-off
Plane $6/user/mo Pro; $13 Business (annual) 12 users Engineering teams, self-hosting Less polished UI than Linear
Shortcut $8.50 Team; $12 Business 10 users Product teams wanting stories and iterations Smaller integration ecosystem
Trello $5 Standard; $10 Premium (annual) 10 collaborators, 10 boards Simple visual tracking No real dependency engine
Hive $5 Starter; $12 Teams 10 members Cross-functional teams with approvals Add-ons add up quickly
Teamwork $9.99 Basics; $24.99 Accelerate (annual) 5 users, 5 projects Client delivery with billing Heavier than an issue tracker needs to be

Linear Business at $16 sits at the top of this range, which is worth remembering: you are paying for polish and speed, and both are real, but neither is a reporting feature.

Plane: the engineering-native option with self-hosting

Plane organises work into projects, work items, cycles, and modules, with pages and a workspace wiki attached. Free covers 12 users with core layout views; Pro is $6 per user per month billed annually ($8 monthly) with 500 AI credits per seat, custom work item types, time tracking, dashboards, initiatives, and teamspaces; Business is $13 annual ($15 monthly) with intake forms, a single enforced workflow, templates, and 1,000 credits.

Strengths: the Linear importer works, the API and webhooks are solid, and self-hosting is a first-class option. For a team that wants Linear’s shape without per-seat dependency on a vendor, this is the closest match. SOC 2, ISO 27001, HIPAA, and GDPR certifications are listed for both cloud and self-hosted deployments.

Limits: the interface is denser and less forgiving than Linear’s, and the configuration surface is larger. Self-hosting means you own uptime, upgrades, and backups — budget four hours a month for a small instance.

Choose it if: you want open-source control, or you are consolidating issue tracking and documentation into one tool.

Shortcut: product-team workflow at a lower price

Shortcut uses stories, epics, iterations, and objectives, with Kanban boards, roadmaps, docs, and reporting built in. Free covers 10 users and one team; Team is $8.50 per user per month with more reports, work-in-progress limits, multiple workflows, and automations; Business is $12 with unlimited everything, strategic objectives and key results, advanced custom fields, and multiple workspaces. Enterprise is custom.

Strengths: Objectives map reasonably well onto OKRs, and the free tier is genuinely usable for a small product team. The importer handles Jira, Trello, and Pivotal Tracker, and the MCP server exposes workspace data to AI tools.

Limits: the integration catalogue is smaller than Linear’s, and the “stories” vocabulary will confuse anyone raised on tasks and tickets. Reporting is better than Trello’s and weaker than a BI-connected portfolio tool.

Choose it if: you are a product and engineering organisation of 10–50 people that wants structure without Linear’s price.

Trello: the visual option that stays cheap

Trello is boards, cards, and lists with Butler automation. Free covers 10 collaborators and 10 boards per workspace; Standard is $5 per user per month billed annually ($6 monthly) with unlimited boards, custom fields, and AI capture; Premium is $10 annual ($12.50 monthly) with timeline, table, dashboard, and calendar views; Enterprise is $17.50.

Strengths: the cheapest credible option on this list, and the fastest to adopt. For a design or content team that was mangled into Linear’s issue model, it is a relief.

Limits: no dependency engine, no capacity planning, and cross-board reporting is a Power-Up exercise. At 2,000 cards the board becomes a search problem rather than a workflow.

Choose it if: you need visibility, not velocity metrics, and your work has short cycles.

Hive: when half the company is not engineering

Hive combines Kanban, Gantt, calendar, and table views with collaborative notes and email-to-task capture. Free covers 10 members with 200MB storage and 1,000 AI credits a month; Starter is $5 per user per month with unlimited storage and 10 projects; Teams is $12 with unlimited members, time tracking, portfolios, custom fields, and forms. Add-ons — proofing, timesheets, resourcing, dashboards, SSO, external users — are $5 per user per month each.

Strengths: the best balance here for a mixed team where marketing, design, and engineering all need one place. Approvals and proofing are useful if you ship creative work.

Limits: the add-on stack is where budgets go wrong. Teams plus three add-ons is $27 per user per month, above Linear Business.

Choose it if: the reason you are leaving Linear is that 60% of your company cannot use it.

Teamwork: client delivery with the money attached

Teamwork.com is built for client work: tasks, Gantt and board views, time tracking, budgets, retainers, and invoicing. Free covers up to 5 users and 5 projects; Basics is $9.99 per user per month billed annually; Accelerate is $24.99 with workload planning, intake forms, and client invoicing. Importers cover Basecamp, Asana, Trello, ClickUp, Monday, and Wrike; the AI teammates are included during an introductory period.

Strengths: profitability per project is a report, not a spreadsheet. If your “engineering” work is actually billable client delivery, this is the most complete answer.

Limits: it is not an issue tracker. Developers will miss keyboard-driven triage, and the interface assumes project managers exist.

Choose it if: you bill clients and need utilisation, budgets, and invoices next to the work.

What does switching actually cost at 15 and 35 seats?

Prices only become a decision when you multiply them. Here is the annual maths for the mid-tier plan of each tool, billed yearly.

Tool and plan 15 users, per year 35 users, per year
Linear Business ($16) $2,880 $6,720
Shortcut Business ($12) $2,160 $5,040
Plane Business ($13) $2,340 $5,460
Plane Pro ($6) $1,080 $2,520
Hive Teams ($12) $2,160 $5,040
Trello Premium ($10) $1,800 $4,200

At 15 seats, moving from Linear Business to Plane Business saves $540 a year — less than a day of engineer time, so the decision should be made on workflow fit, not price. At 35 seats the gap to Plane Pro reaches $4,200 a year, which starts to be a real budget line.

Now consider the blended-team scenario, which is the most common reason people search for Linear alternatives. Fifteen engineers plus twenty people in support, sales, and delivery: Linear Business for all 35 costs $6,720 a year. Keeping Linear for the engineers ($2,880) and putting the other twenty on Trello Standard ($1,200) costs $4,080 — a saving of $2,640, at the cost of running two systems and one integration to keep requests in sync. That is a legitimate architecture, and it is often more honest than forcing a sales team into cycles.

> Important note: the cheapest option is not always the smallest invoice. Two tools mean two admin surfaces, two sources of truth, and a monthly reconciliation someone has to own. Price the coordination time before you celebrate the saving.

Does leaving Linear break your engineering workflow?

It can, if you depend on deep GitHub, GitLab, Slack, and Sentry integrations and on fast keyboard triage. Before committing, test four things:

  • Branch and PR linkage. Does the new tool create and update issues from commits and pull requests?
  • Triage speed. Time a real triage session. If entering twenty issues takes twice as long, the team will resent the change within a month.
  • API and webhooks. Anything you automate today must have an equivalent, or the automation dies quietly.
  • Search. Can you find a two-year-old decision by keyword in under ten seconds?

Plane and Shortcut both pass these tests for most teams; Trello passes the first two only with Power-Ups; Hive and Teamwork pass with configuration.

How do you migrate from Linear without losing history?

  1. Export issues and projects via CSV or the API. Linear’s export includes issues, projects, cycles, and comments in most plans — verify what your plan includes before you start.
  2. Decide what history is worth keeping. For a typical 2,400-issue workspace, 30–40% is closed work nobody will read. Archive it, do not import it.
  3. Map states before import. Linear’s default workflow (backlog, todo, in progress, done, cancelled) rarely matches the target tool. Build the mapping in a spreadsheet first.
  4. Run one team in parallel for two weeks. Pick the team with the messiest backlog. If they survive, the rest will.
  5. Cut over and freeze. Set Linear to read-only, publish the new triage rules, and keep the export for a year.

Realistic effort for a 15-person team with 2,400 issues and 18 projects: 10–16 hours of preparation, 2–3 hours of import and verification, plus the parallel run.

Which alternative matches your team shape?

Team shape Best fit Reason
10–30 engineers, want control Plane Engineering-native, self-hostable, cheaper
Product org with OKRs Shortcut Objectives and iterations, lower price
Design or content team forced into issues Trello Visual, cheap, fast to adopt
Mixed company, one workspace Hive Non-engineering friendly, Gantt and notes
Client delivery with billing Teamwork Time, budgets, invoicing
Goal-driven with capacity and reporting Doitify Goals, tasks, workload, and reports connected

Common mistakes when leaving Linear

  • Choosing on price alone. A $500 annual saving that costs each engineer ten minutes a day is a loss.
  • Importing everything. Old closed issues make search worse and onboarding slower.
  • Keeping Linear “just in case” for one team. You end up with two backlogs and no single answer to “what are we working on?”
  • Skipping the triage test. Speed is Linear’s core feature; if the replacement is slow, the migration will fail for cultural reasons.
  • Ignoring the guest math. Many teams over-buy seats for people who only need to comment or view.

Before you choose, ask these questions

  • Which of your current workflows depend on Linear-specific behaviour (cycles, triage, keyboard shortcuts)?
  • How many people need edit rights, and how many only need visibility?
  • Do you need time tracking or client billing in the same tool?
  • Will you self-host, and who owns upgrades and backups if you do?
  • What does your GitHub or GitLab integration actually do today?
  • How many issues must survive the migration, honestly?
  • Who will own triage rules after the switch?

Where Doitify fits

Doitify is our product, so read this section with that in mind. We are not trying to be a faster issue tracker; the gap we build for is the one above Linear — connecting a goal to a project, the project to tasks and sub-tasks with owners and checklists, and the whole chain to workload, performance, and progress reporting.

In practice that means Kanban boards and sprints for delivery teams, Gantt and calendar views plus WBS dependencies for work that has a schedule, roadmaps and milestones for the quarter, and workload and performance reports for the people who have to staff the work. The Copilot and AI Coach can turn a stated goal into a plan, and team chat keeps discussion next to the task. CRM and finance modules exist for teams that bill clients.

The trade-off is honest: if your team is fifteen engineers who want the fastest possible keyboard triage and nothing else, Linear is excellent and Doitify is more system than you need. If the problem is that engineering speed is invisible to the rest of the company, that is a different problem, and it is the one we solve.

FAQ

Plane is the closest in shape: issues, cycles, projects, and a keyboard-friendly workflow, with the option to self-host. Shortcut is the closest in spirit for product teams that want iterations and objectives at a lower price.

Linear's Free plan includes unlimited members but only two teams and 250 issues, with the agent platform and MCP access included. It suits a small team or a pilot, not a full backlog.

Basic is $10 per user per month and Business is $16 per user per month, both billed yearly. Enterprise is custom and adds SAML, SCIM, audit logs, and advanced security.

Yes — Plane supports self-hosting on your own infrastructure, with documented compliance certifications for self-hosted deployments. Most other options on this list are cloud-only.

Not if you export first and import into a tool with a mapping plan. Expect to archive 30–40% of closed issues rather than migrate them, and keep the export file for at least a year.

No. A common pattern is engineering on an issue tracker and the rest of the company on a project tool, connected by an intake form or integration. Just assign one owner for the boundary.

Conclusion

Linear is still one of the best tools for a focused engineering team, and most teams that leave it do so for reasons that have nothing to do with issue tracking: money, reporting, or the forty people outside engineering who need to see the work.

Choose Plane if you want the same shape with more control, Shortcut if you want product planning at a lower price, Trello if you want visual simplicity, Hive or Teamwork if the real requirement is cross-functional or client-facing delivery, and Doitify if the missing layer is the connection between goals, capacity, and results. Then run one team in parallel for two weeks. That test will tell you more than any comparison table.

If this post on linear alternatives was helpful, you might also enjoy Project Baseline: Scope, Schedule and Cost Baselines Explained and Burndown vs Burnup Chart: Key Differences, Pros and Cons, and When to Use Each.

Join Doitify Today

Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.

0 0 votes
Article Rating
Share
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Table of Contents

Ready to do more with Doitify?

Bring your projects, team, and goals together in one AI-powered workspace.

Get Started
Table of Contents