Your only limit is your mind

Loading...

Doitify
Pricing Enterprise Download Contact Us
Doitify › Project Planning & Execution

“Best Any.do Alternatives in 2026 (Free and Paid)”

Updated on November 12, 2026 https://doitify.com/planning/best-anydo-alternatives/
Share
Summary

The best Any.do alternatives in 2026, compared with current pricing: Todoist, TickTick, Things 3, Google Tasks, Microsoft To Do, ClickUp, Freedcamp, and.

Any.do in 2026 costs $4.99 per user/month billed annually on Premium ($7.99 monthly), with Family at $8.33/month for four members and Teams at $4.99 per member/month annually. The best alternative depends on the gap: Todoist for personal task depth, TickTick for features per dollar, ClickUp for team projects, Google Tasks or Microsoft To Do for free ecosystem fit.

Why do people leave Any.do in 2026?

Four reasons show up again and again, and naming them saves you from switching to a tool that has the same problem.

The team layer feels bolted on. Any.do Teams is functional and reasonably priced at $4.99 per member per month annually, but the product’s centre of gravity is still the individual. Teams that need dependencies, workload, and cross-project reporting find themselves assembling views that other tools ship natively.

Premium is priced per person for personal software. At $4.99 monthly-equivalent annual and $7.99 month to month, Premium is in the same bracket as Todoist Pro ($5 annual, $7 monthly) and TickTick Premium ($49.99 per year). If all you need is recurring tasks and reminders, that is a lot of money for the increment.

Project management is borrowed, not built. Any.do’s boards and templates are useful, but a 20-person project eventually wants custom fields, saved filters, time tracking, and a Gantt view. Those requests are where the tool stops being the answer.

Ecosystem friction. If your organisation lives in Microsoft 365 or Google Workspace, a separate task app is another login, another permission model, and another place data can be out of date.

One honest note in Any.do’s favour: its free plan still covers tasks, lists, reminders, calendar, My Day, and cross-device sync. For a single user managing their own life, that remains a strong free product, and the best “alternative” may be to stay and stop paying for Premium.

What are the best Any.do alternatives in 2026?

The table compares the options worth considering, with prices checked in November 2026, USD, annual billing where available, excluding tax.

Tool Best for Free plan Paid price (2026) The catch
Any.do (baseline) Simple personal lists Tasks, lists, calendar, My Day Premium $4.99/user/mo annual, $7.99 monthly; Teams $4.99/member/mo annual Light project features, per-seat cost for personal use
Todoist Personal task depth and quick capture 5 projects, 3 filters, 1 week history Pro $5/mo annual ($60/yr), $7 monthly; Business $8/user/mo annual Not a project management tool; boards are thin
TickTick Maximum features per dollar 9 lists, 99 tasks per list Premium $49.99/yr (about $4.17/mo) Team collaboration is minimal
Things 3 Best-designed Apple-only task manager None (paid app) One-time purchase, roughly $50 on Mac plus iPhone/iPad apps Apple only, no real collaboration
Google Tasks Free, minimal, inside Gmail Full product, free $0 with a Google account Bare minimum: no boards, limited sharing
Microsoft To Do Microsoft 365 households and teams Full product, free $0 with a Microsoft account; bundled in M365 Task-level only, no project views
ClickUp Team projects with depth Unlimited members, 100 MB storage Unlimited $7/user/mo annual, $10 monthly Configuration overhead; free tier caps storage and views
Freedcamp Budget team projects Unlimited users, projects, tasks Pro $1.49/user/mo annual, Business $7.49 Interface is dated; advanced features split by tier
Doitify Projects, tasks, reports in one workspace Free trial See current pricing page Newer ecosystem than incumbents

Two things stand out. First, the free tier of a team tool (ClickUp, Freedcamp) is often better value than the paid tier of a personal tool. Second, one-time purchases such as Things 3 look cheap until you count the absence of collaboration and the Apple-only constraint.

Join Doitify Today

Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.

How do Todoist and TickTick compare for personal use?

They are the two closest replacements for what Any.do does well, and they diverge on philosophy.

Todoist wins on capture speed and natural language. Typing “call the accountant every second Tuesday at 9am” produces a correct recurring task without opening a dialog. The 2026 plans are Beginner (free, 5 projects, 3 filters, one week of history), Pro at $5 per month billed annually ($60/year) or $7 monthly, and Business at $8 per user per month annually. Pro raises limits to 300 projects, calendar and table layouts, 150 filters, and full history. It is the better choice if your life is a long list of small commitments.

TickTick wins on features per dollar. Premium is $49.99 per year, roughly $4.17 per month, and includes multiple calendar views, task duration, pomodoro-style focus, habits, and a wider set of integrations. The free plan covers 9 lists and 99 tasks per list, which is enough for a light personal system. Its team features remain thin, so it is a personal tool with shared-list convenience rather than a project platform.

Worked example: a freelancer with 40 active tasks and a billing calendar. Todoist Pro costs $60 a year and handles capture and calendar layout well. TickTick Premium costs $49.99 and adds habit tracking and a pomodoro timer they would otherwise buy separately (often $3–5 per month). Over three years, TickTick saves about $30 on subscriptions plus whatever the timer would have cost, so the difference is small and the deciding factor should be interface preference, not price.

How do the free options compare?

Free is a legitimate answer, especially if the gap you are closing is “I do not want to pay $60 a year to write down tasks.”

Google Tasks is the minimal option: free with any Google account, visible inside Gmail and Calendar, and adequate for a simple list. It has no boards, no project hierarchy, and limited sharing. Choose it if the alternative is a notebook.

Microsoft To Do is free with a Microsoft account and included in Microsoft 365. It handles lists, steps, reminders, My Day, and shared lists, and it integrates with Outlook. For an organisation already standardised on Microsoft, it removes a login and a data-sharing question.

ClickUp free is the strongest free option for actual projects: unlimited members, list and board views, and 100 MB of storage. The limits bite in storage, some views, and automation quotas, and the interface rewards configuration time. It is a good place to test whether your team will use a project tool before paying for one.

Freedcamp free is unusual in offering unlimited users, projects, tasks, and storage on the free plan, with paid tiers from $1.49 per user per month annually. Its Business tier, at $7.49, adds Gantt, custom fields, and reports. For a volunteer group or a small charity, it may be the most cost-effective serious option.

What does switching actually cost?

Two numbers: money and time. The money is easy. The time is where people underestimate.

Worked example, six-person team currently on Any.do Teams at $4.99 per member per month billed annually, which is $359.28 per year. Option A: ClickUp Unlimited at $7 per user per month annually, $504 per year, a $145 increase. Option B: Freedcamp Business at $7.49 per user per month annually, $539.28, a $180 increase. Option C: stay on Any.do and add a spreadsheet for reporting, which costs $0 in licences.

Now the time. Migration involves exporting tasks (CSV or JSON), cleaning duplicates, mapping projects and labels, rebuilding recurring tasks (which rarely transfer cleanly), re-inviting people, and re-creating integrations. A realistic estimate for six people and 600 open tasks is 20–30 hours of admin, plus two weeks of parallel running at perhaps 1 hour per person per week, so 12 more hours. At a $45 loaded hourly rate, that is roughly $1,440–$1,890 in staff time — four to five times the annual licence difference.

The implication is uncomfortable but useful: if you are switching purely to save $150 a year, do not. Switch because the current tool costs you a recurring hour every week, which at six people is worth about $14,000 a year in wasted time.

Path Annual licence (6 users) Migration effort Break-even
Stay on Any.do Teams $359 $0 —
Move to ClickUp Unlimited $504 25–40 hours Only if it removes 1 hour/week of coordination
Move to Freedcamp Business $539 25–40 hours Same threshold, plus Gantt and reports
Drop to Any.do free + spreadsheet $0 5 hours If no one needs shared boards

Which tool fits which situation?

Matching the gap to the tool is faster than comparing feature lists.

You are one person with a busy life. Stay on Any.do free, or move to Todoist Pro if capture speed matters, or TickTick if you want habits and focus timers in the same app. Paying for Premium mostly buys recurring tasks, WhatsApp reminders, and colour tags; check you will use those weekly.

You are a family. Any.do Family at $8.33 per month for four members is competitive with buying four separate subscriptions anywhere else. Alternatives are Microsoft To Do shared lists (free) or Google Keep plus Calendar (free but weaker).

You are a 5–15 person team with real projects. ClickUp, Freedcamp, or Doitify. Prioritise permissions, reporting, and a working calendar view over the length of the template library.

You are inside Microsoft 365. Microsoft To Do plus Planner covers a surprising amount for $0 extra. Move to a dedicated tool only when Planner’s reporting and dependencies become the bottleneck.

You need client-facing project visibility. Choose a tool with guest access that does not bill for viewers, and check that policy before you commit; it changes the total cost more than the per-seat price.

What are the trade-offs nobody mentions?

Feature depth versus adoption. ClickUp can do almost anything, which is exactly why half-configured workspaces appear. A tool with twelve settings gets used on Monday; a tool with ninety gets a two-week rollout and a wiki nobody reads.

Free tiers versus data ownership. A free plan that caps exports or history is a soft lock-in. Test the export before you invest a year of project data.

Per-seat pricing versus guests. Any.do bills every workspace member; Todoist Business includes up to 1,000 guests; Freedcamp makes read-only collaborators free on paid plans. A 10-person team with 20 client viewers sees a very different bill depending on this single policy.

One-time purchase versus ongoing development. Things 3’s model is refreshing and means no subscription. It also means no team features, no Windows, and no web app, so a single Windows laptop in the team breaks the plan.

Switching versus fixing. Much of what people dislike about a task tool is really a workflow problem: no weekly review, no naming convention, no owner field. Moving those habits to a new tool reproduces them within a month.

How does Doitify compare as an Any.do alternative?

Doitify is our product, so read this as disclosure. It is built as one workspace for projects, tasks, sub-tasks, checklists, owners, and due dates, with Kanban boards, Gantt charts, roadmaps, calendars, workload views, work and performance reports, automations, project documents, and import/export. AI features, Doitify Copilot and AI Coach, help turn a goal into tasks and a plan.

Where it makes sense: a team that has outgrown a personal task app and does not want to spend three weeks configuring an enterprise platform. Where it does not: a single user who wants a beautiful list and nothing else, or an organisation already committed to a Microsoft or Google stack where a free native tool covers the need. Honest positioning beats a longer feature list.

If you are evaluating, run the same three tasks in each tool: add a task from your phone in under five seconds, find every task assigned to one person this week, and produce a status view a client could read. Most decisions become obvious by task three.

FAQ

For personal task management, Todoist. For the most features per dollar, TickTick at $49.99 per year. For team projects, ClickUp or Doitify. For zero cost inside an existing ecosystem, Google Tasks or Microsoft To Do.

Yes. Google Tasks and Microsoft To Do are fully free, and ClickUp and Freedcamp offer free plans that cover real project work for small teams. The limits are storage, automation, and reporting rather than core task management.

Premium is $4.99 per month billed annually or $7.99 monthly. Family is $8.33 per month for four members annually ($9.99 monthly), and Teams is $4.99 per member per month annually ($7.99 monthly). A free plan remains available.

Any.do supports export, and most competitors accept CSV imports. Recurring tasks, attachments, and shared lists usually need manual reconstruction. Budget 20–40 hours for a small team, and run both tools in parallel for two weeks.

They solve different problems. Todoist is stronger at capture speed, filters, and project depth for personal use; Any.do is stronger at calendar-first planning and family sharing. If you need boards and dependencies, neither is the right tool.

Usually not at first. Free plans from ClickUp and Freedcamp support small teams well. Upgrade when you need reporting, permissions, or automation, and check guest-seat policy before you do.

Export completeness, guest and viewer pricing, recurring-task handling, integration coverage, and whether the free tier caps history. Test all five in the trial, not after the migration.

Over three years, yes for a single Apple user: roughly $50 once versus $150–$180 in subscriptions. It is more expensive the moment you need Windows, a web app, or collaboration, because there is no version to buy.

Conclusion

The best Any.do alternatives in 2026 are not ranked by feature count, because the tool you leave is rarely failing on features. Match the gap: personal capture goes to Todoist, value per dollar to TickTick, team projects to ClickUp or Doitify, and ecosystem fit to Google Tasks or Microsoft To Do.

Before you commit, run the three-test evaluation, price in the guest seats, and calculate the switching cost honestly. If the current tool costs you an hour a week, move. If it only costs you the subscription, stay and cancel the upgrade instead. And if you want a single workspace where tasks, timelines, workload, and reports share one data model, you can start a free trial in Doitify and compare it against the list above with your own work in it.

If this post on best Any.do alternatives was helpful, you might also enjoy How to Create a Work Breakdown Structure (8 Steps) and How to Turn Meeting Notes Into Action Items (Step-by-Step).

Join Doitify Today

Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.

0 0 votes
Article Rating
Share
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Table of Contents

Ready to do more with Doitify?

Bring your projects, team, and goals together in one AI-powered workspace.

Get Started
Table of Contents