Your goals are closer than you think

Loading...

Doitify
Pricing Enterprise Download Contact Us
Doitify › Career Development

Best Project Management Podcasts to Follow

Updated on November 12, 2026 https://doitify.com/career/best-pm-podcasts/
Share
Summary

Nine active project management podcasts, with hosts, cadence, and what each is best for, plus how to listen so the ideas actually stick.

Nine shows are worth your time in 2026, each with a different job: exam prep, delivery tactics, agile coaching, project controls, or career strategy. The Project Management Podcast is the long-running generalist; Projectified is the PMI-produced strategy show; PM Happy Hour is the most practical for messy stakeholder problems.

What makes a project management podcast worth your time?

A show earns a place on your list if it is still publishing, if the host names the guest’s actual role, and if the show notes let you skip what you already know. Everything else is entertainment, which is fine, but it is not learning.

Four tests separate a working show from a dead one:

  1. A recent episode. Check the latest release date, not the episode count. Anything silent for 90 days is dormant, whatever the website claims.
  2. A named, practising host. A host who still runs projects asks better questions than one who only interviews. A host who left is a signal that the feed is a rerun channel.
  3. Show notes with structure. Timestamps, guest links, and a written summary mean you can extract value in five minutes when the audio is not convenient.
  4. A clear editorial line. Exam prep, delivery tactics, and career advice are three different products. A show that tries all three in one episode usually does none well.

> Important note: ratings on Apple Podcasts are a weak signal. A show with 800 reviews and a 4.2 has a real audience; a show with nine reviews and a 5.0 has a mailing list. Read the negative reviews instead, because they tell you what the format actually costs you.

Which project management podcasts are active in 2026?

These nine are publishing, hosted, and linked. Lengths and cadences are approximate and based on their public feeds and sites at the time of writing.

Show Host(s) Cadence and length Best for Link
The Project Management Podcast Cornelius Fichtner, PMP Ongoing, 30–60 min Broad practitioner interviews and exam context pm-podcast.com
Projectified Melissa Khan-Blackmore, PMP (PMI) Season-based, about 24 min Strategy, portfolio thinking, PMI research pmi.org
Project Management Happy Hour Kim Essendrup and Kate Anderson Weekly, about 47 min Stakeholders, politics, difficult conversations pmhappyhour.com
Manage This Bill Yates with Wendy Grounds (Velociteach) Biweekly, about 41 min Structured lessons and exam-adjacent topics velociteach.com
People and Projects Podcast Andy Kaufman Regular, about 52 min Leadership, influence, AI and people skills peopleandprojectspodcast.com
5 Minutes Podcast Ricardo Vargas Weekly, 6–7 min Fast, single-idea episodes on risk and judgment ricardo-vargas.com
Scrum Master Toolbox Vasco Duarte Weekdays, about 16 min Agile coaching stories from working practitioners scrum-master-toolbox.org
The Digital Project Manager Galen Low Weekly, 30–55 min Digital delivery, agencies, AI in delivery thedigitalprojectmanager.com
Project Chatter Dale Foong and Val Matthews Regular, 40–60 min Project controls, PMO, scheduling careers projectchatterpodcast.com

Join Doitify Today

Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.

Which show should you start with if you are new to project management?

Start with The Project Management Podcast. Cornelius Fichtner has been interviewing project managers since the mid-2000s, and the archive covers the vocabulary you need before anything else makes sense: charters, baselines, risk registers, stakeholder maps, and the difference between a milestone and a deliverable. The show’s weakness is the same as its strength. Breadth means episodes vary in depth, so a beginner should pick by topic rather than by date.

If you are new and impatient, alternate it with 5 Minutes Podcast. Ricardo Vargas publishes a single idea per episode in six or seven minutes, often built around a concrete story: a project that delivered everything it was asked and solved nothing, or a team that normalised a small failure until it became a habit. At that length, a weak episode costs you almost nothing.

Which show is best for stakeholder and people problems?

PM Happy Hour is the most useful show for the parts of the job nobody trains you for. Kim Essendrup and Kate Anderson have both run projects for more than 25 years, and the format is a single problem per episode with practical options rather than a framework tour. Sponsors who disengage, meetings that go nowhere, teams that agree in the room and stall afterwards: that is the territory.

Two caveats. The tone is conversational and occasionally salty, which is a feature for most listeners and a problem for none, but it is not a show to play on a speaker in an open office. And the hosts structure each episode as a PMI-approved class, so the pacing includes some teaching scaffolding that a 15-year veteran may find slow.

Which show covers agile delivery without the ideology?

Two, depending on whether you want coaching stories or digital delivery tactics. Scrum Master Toolbox runs a five-day interview series with one practitioner at a time, so you hear the same coach work through a problem from several angles across a week. Episodes average around 16 minutes, which is why the show has produced thousands of them since 2016.

The Digital Project Manager comes from the agency and digital delivery world, where budgets are small, stakeholders are demanding, and the plan changes on Thursday. Galen Low has hosted since 2017 and moved the editorial line toward AI in delivery, which makes it the most current show on this list and also the most dependent on your tolerance for AI topics.

Which show helps with project controls and scheduling?

Project Chatter is the specialist choice. Dale Foong and Val Matthews talk about earned value, scheduling, PMO structure, and the career path from controller to PMO lead, usually with a guest from a large programme. It is not glossy, and that is the point: controls work is unglamorous, and the show treats it that way.

If your role touches cost or schedule performance, pair it with Manage This, which is produced by Velociteach and hosted by Bill Yates with Wendy Grounds. The show has passed 250 episodes and keeps a steady biweekly rhythm, with episodes on failure, invisible project management, and the AI pressure on delivery speed.

How much can you actually learn in a week?

Less than the playlist suggests, and the arithmetic is worth doing once. Suppose your commute is 24 minutes each way, five days a week: 240 minutes, or four hours. At 1.5× playback speed, a 47-minute PM Happy Hour episode takes about 31 minutes, so four hours is roughly seven episodes. That is a real amount of input, but it is also the ceiling.

Listening pattern Weekly time Episodes at 40 min Episodes at 1.5× Realistic retention
20-minute walk, 5 days 1 h 40 m 2.5 3.7 High, if you take one note
24-minute commute, both ways 4 h 6 9 Medium
Gym plus chores, 3 hours 3 h 4.5 6.7 Low without notes
Passive background all day 15 h+ 22 33 Very low

The last row is the trap. Podcasts are the only learning format where more consumption reliably produces less retention, because nothing forces you to reconstruct what you heard. If you cannot state the argument of an episode in two sentences the next day, the episode was background noise with a good intro.

A more useful target: three episodes a week, one written line each, one action taken per month. Three episodes is 36 a year, which is more than most shows publish and far more than most listeners finish.

Do podcasts count toward PMP PDUs?

Yes, for some shows. PMI requires 60 professional development units across a three-year certification cycle, with at least 35 coming from education and no more than 25 from giving back. Several shows on this list are built to qualify: PM Happy Hour describes each episode as a PMI-approved class, and People and Projects offers free PDUs for listening.

The arithmetic is encouraging but not unlimited. If a show awards one PDU per episode, 35 education PDUs over three years is roughly one episode a month. You will not certify on podcasts alone, and you should not try. What podcasts do well is keep the education category moving between formal courses, especially in the leadership and strategic buckets where PMs often come up short.

> Common mistake: claiming PDUs for episodes you played at 2× while doing something else. PMI’s audit process asks for evidence, and “I listened while driving” is thin evidence. Keep a simple log: date, show, episode title, duration, and the one thing you applied.

Which podcast fits your career stage?

Match the show to the problem in front of you, not to your job title.

  • Certifying in the next six months: The Project Management Podcast for context, Manage This for structured review, plus one exam-specific course. Podcasts explain; they do not drill.
  • First year as a PM: 5 Minutes Podcast for vocabulary and judgment, PM Happy Hour for the human problems that arrive in week three.
  • Running complex programmes: Projectified for portfolio framing, Project Chatter for controls depth.
  • Coaching or Scrum Master work: Scrum Master Toolbox, five days a week, one practitioner at a time.
  • Agency or digital delivery: The Digital Project Manager, especially the episodes on scope, estimation, and AI-assisted delivery.
  • Thinking about leaving delivery for leadership: People and Projects, which spends most of its time on influence and communication rather than process.

How do you listen so it actually sticks?

Treat listening as an input to a small system, not as a habit you squeeze into gaps. The system has four parts, and none of them require an app.

One show per quarter as your primary. Rotate deliberately. Four shows a year, each heard properly, beats nine shows sampled randomly. Write the show name and the quarter on a note so you notice when you are drifting.

One line per episode. Not a summary, one line: the claim, and whether you believe it. “Guest argues that a gate without kill authority is a status meeting; agree, our stage reviews never kill anything.” That single line is what you will remember in six months.

One experiment per month. Pick the smallest testable idea from the month’s notes and run it on a real project. If an episode argues that blockers need a named owner and a deadline, add an owner column to your blocker list for two weeks and see what changes.

One conversation per episode. Tell a colleague the argument in 90 seconds. If you cannot, you did not understand it well enough to apply it. This is the cheapest retention trick available and the one most listeners skip.

What are the common mistakes podcast listeners make?

  • Subscribing to everything. Nine subscriptions produce a queue that feels like debt. Two active shows and one rotating slot is enough.
  • Starting from episode one. Archives are not courses. Start with the ten most recent episodes and work backwards only when a topic demands it.
  • Ignoring the show notes. Five minutes of skimming tells you whether the 50-minute episode is worth your commute.
  • Listening only to guests you already know. The value is in the unfamiliar practitioner describing a problem you have not faced yet.
  • Confusing listening with doing. A PM who has heard 200 episodes about stakeholder mapping and has never written a stakeholder map has a hobby, not a practice.
  • Chasing PDU arithmetic. If the only reason you press play is a credit, pick a different show or a different format.

When is a podcast the wrong format?

A podcast is poor at three things: teaching a method step by step, giving you feedback, and making you practise. If you need to learn how to build a WBS, run a earned value calculation, or facilitate a retrospective, a course or a supervised project will beat 40 hours of audio.

It is also weak for anything that requires reference. A formula, a template, or a decision tree belongs in a document you can search. Use audio for judgment, context, and the stories that tell you what a problem feels like before you meet it.

The honest trade-off: podcasts are free, portable, and cheap per hour, and they are the lowest-commitment learning format available. That low commitment is exactly why they rarely change behaviour without a deliberate system around them.

Where does Doitify fit into a learning habit?

Doitify fits at the point where an episode gives you an idea you want to test. A podcast can tell you that blockers need owners and deadlines, but the practice lives in the tool: a task with a named owner and a due date, a checklist for the recurring review, a milestone for the gate the episode described, a risk entry with an owner and a review date, and a report that shows whether the change held for four weeks.

That is the practical bridge between listening and learning. Doitify is our product, so treat that as a disclosure rather than a recommendation: the platform is useful when you already have something to test. If you are still deciding what to test, the next episode is a better use of the commute.

FAQ

Two active shows plus one rotating slot. More than that and the queue becomes noise. Rotate the third slot each quarter based on the problem you are actually solving.

Yes. All nine publish free feeds through Apple Podcasts, Spotify, or their own sites. Some hosts sell courses or coaching alongside the show, which is worth knowing when an episode starts to sound like a sales page.

For some shows, yes. PM Happy Hour and People and Projects both describe PDU-eligible listening, and PMI accepts education activities that relate to the talent triangle. Keep a log with dates, titles, and durations in case you are audited.

None of them is an exam course. The Project Management Podcast and Manage This both cover exam-relevant material, and Fichtner's site is built around PMP preparation, but you still need a question bank and a study plan. Use audio to reinforce, not to prepare.

No, but do not go past 1.5× for dense material. Above that, comprehension of numbers and names drops sharply, and those are usually the parts you need. Speed up the conversational shows and keep the technical ones at normal speed.

Several shows publish video: The Project Management Podcast, Projectified, Manage This, and People and Projects all offer video on YouTube or their own sites. Video is better for anything with a diagram; audio is better for a commute.

Check the latest episode date on the show's own site or Apple Podcasts, not a listicle. If the newest episode is more than 90 days old and there is no announced season break, assume it is dormant.

Conclusion

The best project management podcast is the one that answers a question you currently have. For most people that means two subscriptions: a generalist show for breadth, and a specialist show aimed at the problem of the quarter.

Start with The Project Management Podcast and one specialist, listen to three episodes a week, write one line each, and test one idea a month on a real project. That system will teach you more than 300 episodes of passive listening, and it will cost you about four hours a week.

If this post on project management podcasts was helpful, you might also enjoy Project Manager Interview Questions and Answers (With Sample Responses) and Project Management Resume Skills and Examples (2026 Guide).

Join Doitify Today

Move projects forward without the chaos: all your tasks, progress, and team reports in one unified workspace. Built for companies, startups, and remote teams — with a quick setup and a free trial.

0 0 votes
Article Rating
Share
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Table of Contents

Ready to do more with Doitify?

Bring your projects, team, and goals together in one AI-powered workspace.

Get Started
Table of Contents